Technical Office Director · 1996–2026

Fatih
Aydınalev

Contracts, Commercial & Project Controls · Mega EPC Infrastructure

Thirty years in international EPC delivery and, since 2011, head of the technical office on USD 250M–1.5B rail, highway, water and luxury hospitality projects in Saudi Arabia, Tanzania, Qatar and the UAE. I run the technical office as one system, so that time, cost and entitlement are controlled from a single source of truth.

  • MSc Civil Engineering
  • MCIOB, Chartered Construction Manager
  • PMP®
  • FIDIC Contract Management
  • İMO member
30years in international EPC delivery
$4B+portfolio across five EPC projects
$85M+approved claims and variations
$57Maudited value-engineering savings
16 moEOT approved on a USD 1.5B expressway
50staff in the largest technical office led
Plan view: a cloverleaf interchange, drawn for this page
01

About

I am a Chartered Construction Manager (MCIOB) and PMP® with 30 years in international EPC delivery. Since 2011 I have headed the technical office on USD 250M–1.5B rail, highway, water and luxury hospitality projects in Saudi Arabia, Tanzania, Qatar and the UAE.

I build and run the technical office as one integrated system: FIDIC contract and claims administration, planning and project controls, cost and commercial management, subcontract procurement and ERP-based budgeting. I have led teams of up to 50 staff so that time, cost and entitlement are controlled from a single source of truth.

I have worked with Ashghal, KBR, AECOM, Hill International and USACE.

02

Selected achievements

USD 4B+

Portfolio

Technical office and commercial leadership on five EPC projects, with personal accountability for up to USD 1.5B per assignment.

USD 85M+

Approved claims and variations

Qatar USD 43M, Tanzania USD 19.5M, UAE USD 13.2M and Saudi Arabia USD 10.5M (85% of USD 12.4M submitted).

USD 57M

Audited savings

Value-engineering workshops with KBR and AECOM on structural and alignment alternatives.

16 months

EOT approved

Critical-path analysis and EOT case on a USD 1.5B expressway, eliminating USD 45M+ of LD exposure.

10 months

Delay recovered

An 8-month delay cut to 3 (Saudi Arabia) and 5 months recovered (Tanzania) through recovery programmes.

12 → 9 months

Faster handover

Client acceptance shortened through controlled testing, commissioning and handover.

03

Projects

Six projects that shaped how I read a contract. The plates are drawn for this page; they illustrate the type of work, not the actual sites.

04

Technical office systems

What I build and run on a project, and where each one has delivered.

Contract & claims governance

FIDIC-based correspondence, change-management and claims procedures for a 220 km expressway; USD 43M of additional variations approved (Qatar).

Planning & project controls

Master schedules, baseline governance, EVM and cost-to-complete reporting in Primavera P6, run by a team of 15+ planning and cost engineers (Qatar).

Cost & commercial control

USD 1.5B master budget and WBS with monthly EVM; budget variance held below 3% (Qatar) and below 2.5% (Tanzania, Saudi Arabia).

Payment & cash cycle

IPC, final-account and subcontractor payment cycles above USD 1.6B; 96% cash collection on USD 648M of IPCs and 100% of a final account collected.

Procurement & subcontracts

Tendering, risk assessment and back-to-back contract drafting for 85+ subcontract packages across Qatar, Ireland and Saudi Arabia.

ERP & digital controls

SAP S/4HANA cost-centre and corporate budget structure for a USD 1.5B railway; AI-assisted reporting and document workflows.

People & capability

Technical office teams of 40–50 staff (Saudi Arabia), 30–35 (Tanzania) and 15+ planning and cost engineers (Qatar).

Delay & dispute management

Forensic delay analysis, EOT and prolongation claims and DAB support: 16-month EOT (Qatar), USD 19.5M of a USD 29.2M claim (Tanzania), USD 13.2M (UAE).

The FIDIC 2017 Red Book clock, from event to DAAB

28 dNotice of Claim after awarenessSub-Cl. 20.2.1
84 dFully Detailed Claim after awarenessSub-Cl. 20.2.4
42 + 42 dEngineer consults, then determinesSub-Cl. 3.7.3
28 dNotice of Dissatisfaction with the determinationSub-Cl. 3.7.5
42 dRefer the dispute to the DAAB after the NODSub-Cl. 21.4.1
84 dDAAB gives its decisionSub-Cl. 21.4.3
28 dNOD against the DAAB decisionSub-Cl. 21.4.4

Amber marks the steps where a missed date can cost the claim itself. Particular Conditions often change these periods; always check them. The 1999 equivalents are Clause 20.1 (28 and 42 days) and Clause 20.4 (84 and 28 days).

05

Experience

  1. Deputy Project Manager – Technical & Commercial

    Baytur Construction · AlUla, Saudi Arabia

    Luxury hotel and resort complex (EPC), later suspended by the Employer. Directed the combined technical office and commercial function with a team of 40–50: USD 648M of IPCs submitted with 96% cash collected; USD 12.4M of variations and claims negotiated, 85% approved; an 8-month delay cut to 3 through a P6 recovery programme; 7 major subcontract packages tendered and contracted; budget variance below 2.5%.

  2. Technical Office Manager

    Yapı Merkezi Holding · Dodoma, Tanzania

    414 km Standard Gauge Railway, USD 1.5B. Team of 30–35; SAP S/4HANA cost-centre and budget structure with variance below 2.5%; USD 786M of Employer billing and subcontractor payments with no liquidity disruption; USD 29.2M EOT and prolongation claim with USD 19.5M approved; 5 months of critical-path delay recovered.

  3. Technical Office Manager

    Tekfen Construction · Doha, Qatar

    Al Khor Expressway (North Road), 220 km, USD 1.5B, Employer: Ashghal. USD 1.5B master budget and WBS with variance below 3%; team of 15+ planning and cost engineers; FIDIC Red Book claims and change management with USD 43M of variations approved; 16-month EOT; 50+ subcontracts with back-to-back terms; USD 57M of audited savings with KBR and AECOM; acceptance shortened from 12 to 9 months.

  4. Technical Office Manager

    Aydıner Construction · Abu Dhabi, UAE

    1,600 mm ductile-iron water pipeline, USD 250M. FIDIC IPCs and final account, with 100% of the USD 263.2M final contract value collected; 72 of 78 new rates approved (92%); EOT and disruption claim with Hill International, USD 13.2M approved.

  5. Technical Office & Tendering Specialist

    ASFA International · Adana, Türkiye

    U.S. Army Corps of Engineers infrastructure works: tendering, contract compliance and procurement for 120 federal bids.

  6. Project Control / Technical Office Manager

    GAMA Holding · Ireland

    150 MWe power plant, EUR 250M. Baseline and progress metrics in Primavera P3e/c with variance below 4%; 29 subcontracts; forensic delay schedules for the legal team, with the dispute resolved at DAB stage.

  7. Early career

    Tekfen · Alsim Alarko · Türkiye

    Project control and technical office engineer; site engineer.

06

Services

Remote, document-based support for contractors and subcontractors on FIDIC projects, and for client teams that want a contractor's eye on their contracts.

Health check

Contract health check

A short review of your notices, time-bar calendar, records and recent correspondence, with a list of what to fix this month before it becomes a lost entitlement.

Pre-bid

Particular Conditions review

Before you price, a clause-by-clause read of the Particular Conditions against the General Conditions: shifted risks, shortened periods, payment and security terms.

Claims

Notices, EOT and replies to the Engineer

Notices of claim, extension of time submissions, delay registers and replies to the Engineer or PMC, written to stand up later if the matter goes further.

AI

AI for the technical office

A four-week set-up of AI tools on your own documents for correspondence, claims records and commercial reporting, with your team trained and the time saved measured.

07

Industry updates

What changed recently in FIDIC practice, case law and the markets I work in, with a line on why it matters. Updated 18 Nov 2026

FIDIC30 Nov – 3 Dec 2026

FIDIC Contract Users' Conference returns to London

The annual conference runs in London from 30 November, opening with an invitation-only Dispute Avoidance and Adjudication Forum; the Contract Users' Awards are presented on 2 December.

Why it matters: members of FIDIC's contracts committee speak here, so it is the best early signal of how the 2017 suite is being applied and where it is heading.

Source: FIDIC Events

FIDIC19 Nov 2026

Golden Principles for FIDIC Services Agreements

FIDIC is introducing Golden Principles for its consultancy agreements, including the White Book, with an online webinar on 19 November on where amendments to those agreements should stop.

Why it matters: the same logic as the Golden Principles for works contracts now reaches consultant appointments, which shapes how far Particular Conditions can shift risk to consultants.

Sources: FIDIC Events · LexisNexis

Case law22 Jan 2026

Privy Council: no Clause 20.1 notice, no variation payment

In Uniform Building Contractors v WASA [2026] UKPC 2, under a 1999 Yellow Book, the Board held that Clause 20.1 is a condition precedent and dismissed the contractor's claim. It also found the disputed items were not variations at all, because they were already within the lump sum.

Why it matters: an Engineer's informal instruction on site does not replace the variation procedure or the notice. If you are unsure whether something is a variation, give the notice anyway.

Sources: Chapman Tripp · Simmons & Simmons

FIDICFeb 2026

New FIDIC guidance on writing dispute board decisions

FIDIC published guidance for dispute boards, with a focus on drafting decisions in a way that reduces the risk of challenge.

Why it matters: a decision that survives challenge is worth more to the party that wins it; parties can also use the guidance to test a DAAB decision before they issue an NOD.

Source: HFW

MarketsSep 2026

Saudi construction awards rebound in the first half of 2026

MEED Projects reports about USD 20bn of Saudi construction awards in H1 2026, against USD 15bn a year earlier, with a pipeline of more than USD 400bn still to be awarded. New work is shifting to smaller, phased projects.

Why it matters: phased, smaller packages mean more contracts to administer and more interfaces between them, which is where contract and claims capacity is needed.

Sources: MEED · Enterprise

DisputesQ1 2026

NEOM terminations open a wave of termination claims

NEOM terminated several construction contracts in the first quarter of 2026, with cancelled or affected works potentially above USD 5bn based on contractors' disclosures, as part of a wider re-scoping and re-phasing.

Why it matters: each termination brings a termination account, a final account and often a dispute. Contemporaneous records and the termination clause will decide the outcome.

Source: Zawya

DisputesJun 2026

Construction leads Saudi arbitration caseloads

HKA reports that construction and engineering disputes made up about 47% of the 2025 caseload at the Saudi Center for Commercial Arbitration, the largest share of any sector.

Why it matters: in the Kingdom, contract administration now has to be done with arbitration in mind from the first notice.

Source: HKA

DisputesApr – May 2026

Regional conflict and Hormuz disruption feed claims

Law firms in the region are advising on delay and cost claims linked to the regional conflict and shipping disruption through the Strait of Hormuz, and on the evidence needed to support them.

Why it matters: force majeure, exceptional events and cost escalation claims all depend on records that tie each cost and delay to its cause; keep those records from day one.

Sources: Pinsent Masons · BSA Law

MarketsAug 2026

Turkish contractors in Libya's reconstruction

Libya's Development and Reconstruction Fund has signed contracts with Turkish firms for infrastructure and health projects in Benghazi, Al-Bayda, Shahat and Tobruk. During an August visit, Türkiye's foreign minister said Turkish contractors were carrying out major projects in both Tripoli and Benghazi.

Why it matters: many of these contracts are not on FIDIC forms. Contractors need clear notice, variation and payment mechanisms written into bespoke contracts from the start.

Sources: Hürriyet Daily News · Anadolu Agency

AI2026

Claims teams are where AI pays first

PlanRadar's 2026 survey of 1,728 professionals found only 5% never have to reconstruct project history for claims or disputes; non-adopters of AI were 1.7 times more likely to struggle to find documents when preparing claims. A separate 2026 survey of project managers found 48% use AI daily.

Why it matters: AI saves the most time when it sits on top of the records a claim depends on: correspondence, registers and site diaries.

Sources: Construction Management · Mastt

Summaries are mine and paraphrase the linked sources; read the source before relying on any point. Nothing here is legal advice.

08

Reading

The international blogs, newsletters and reference works I read to stay current, with the pieces from them worth your time this year. Each link opens the original publisher.

Fenwick Elliott · London

International Quarterly

A specialist construction law firm's quarterly on international projects and arbitration, with regular pieces on FIDIC.

Read the newsletter →
HKA · global

CRUX Insight

An annual, data-based study of why claims and disputes arise. The eighth report covers more than 2,200 projects in 114 countries, with a free dashboard.

Open CRUX Insight →
Society of Construction Law · UK

Delay and Disruption Protocol

The reference most tribunals and Engineers know for extensions of time and disruption; the 2nd edition was published in February 2017.

See the Protocol →
Howard Kennedy · London

International Construction Law at Large

A newsletter on international construction disputes that also keeps a table of FIDIC cases.

Read the June 2026 issue →
International Bar Association

Construction Law International

The IBA's construction journal, with practitioner features from many jurisdictions, including Middle East and Africa matters.

Read a recent feature →
FIDIC · Geneva

FIDIC events and webinars

FIDIC's own programme of webinars and conferences on its contract suite, dispute avoidance and adjudication.

See upcoming events →

Worth reading in 2026

09 · Contact

Let's read the contract first

For contract and claims roles, remote support on a FIDIC project, or a first conversation about AI in your technical office, e-mail me with a line on the project and what you need.

E-mail
faydinalev@icloud.com
LinkedIn
linkedin.com/in/fatihaydinalev
Based
Türkiye · internationally mobile
Tool
FIDIC time-bar calculator